Hammer drill! HFPV-1 solar pile driver
The drilling rig is mainly used in pile driving for photovoltaic Solar power station , pile driving for Highway guardrail, highway guardrail construction engineering construction, etc.
Impact frequency(bpm)
|
450–800
|
Impact(j)
|
1000
|
Work pressure(bar)
|
130—150
|
Once promotion(mm)
|
5000
|
Skid pitch(°)
|
120
|
Boom swing angle(°)
|
left and right total 50
|
left and right total 50
|
|
Swinging angle of skid(°)
|
left and right total 40
|
Host power(KW)
|
84
|
Climb ability(°)
|
35
|
Weight(Kg)
|
5800
|
Walk speed(km/h)
|
0–2.5
|
Dimension(L*W*H)(mm)
|
6500*1970*2680
|
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.
2. How is the quality of your machine?
Our products pass strict quality inspections before they leave the factory to ensure that they are qualified before they are shipped.
3. How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
4. Do you have after-sales service?
Yes, we have a dedicated service team that will provide you with professional technical guidance. If you need, we can send our engineers to your workplace and provide training for your employees.
5. How about quality assurance?
We provide a one-year quality guarantee for the main machine of the machine.
6. How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.
Reviews
There are no reviews yet.