Hfdx-4 Full Hydraulic Diamond core Drilling Rig Exploration Rig for coal gold copper iron mining project

ر.س124,798.50

Clear
Qty:
Compare

Request quotation for: Hfdx-4 Full Hydraulic Diamond core Drilling Rig Exploration Rig for coal gold copper iron mining project

Product Description

The core drill rig of full hydraulic and rotor adopted the technology of wire-line coring has been the dominant type rig for solid mineral deposits prospecting in developed counties of the world. The rig is light, simple in structure, and easy for
transportation. The mast has the functions of sliding and touching ground, the spindle lifted and lowered with hydraulic cylinder.
It could be folded for transport and relocation. The spindle hole is in large diameter.
Application
HFDX-4 full hydraulic core drilling rig is applied to exploration and prospecting of geology, metallurgy, coal, petroleum, natural gas, groundwater and for other industries.
Detailed Images
Diesel Engine
Model
Cummins 6BTA5.9-C180 (turbocharged
and charge water cooled)
Displacement
5.9L (1.56 US Gallons)
Power
132Kw (180HP)
Rated RPM(Factory setting)
2200rpm
Drilling Capacity
BQ
1000m(3280ft)
NQ
700m(2296ft)
HQ                                                                      500m(1640ft)
500m(1640 feet)
Mud Pump
Type
Reciprocating pump Triplex Plunger
Model
BW160/10
Stroke
70mm(2.76 inch)
Discharge pressure
2.5, 4.0, 6.5, 10.0 Mpa
(363, 580, 943, 1450 psi)
Foot Clamp
Clamping Scope
55.5-110 mm(2.19-4.33 inch)
through hole Ф154mm(6.06 inch)
Others
Weight (platform type)
9300 Kg(20502 lb)
Dimensions (L×W×H)
5100×2200×2450mm
16.73×7.21×8.03ft
Transport Way
Crawler
Deliver
Working Site
FAQ
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.

2. How is the quality of your machine?
Our products pass strict quality inspections before they leave the factory to ensure that they are qualified before they are shipped.

3. How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.

4. Do you have after-sales service?
Yes, we have a dedicated service team that will provide you with professional technical guidance. If you need, we can send our engineers to your workplace and provide training for your employees.

5. How about quality assurance?
We provide a one-year quality guarantee for the main machine of the machine.

6. How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.

Model Number

HFDX-4

Power

132Kw

0★

Rating

  • 5★ 0
  • 4★ 0
  • 3★ 0
  • 2★ 0
  • 1★ 0

Reviews

There are no reviews yet.

Be the first to review “Hfdx-4 Full Hydraulic Diamond core Drilling Rig Exploration Rig for coal gold copper iron mining project”

Your email address will not be published. Required fields are marked *

Vendor Information

  • Address:
  • 5.00 5.00 rating from 1 review