2021 Professional HFPV-1B Pile Driving Machine foundation Construction Equipment Solar Pile Driver

ر.س193,608.80

Clear
Qty:
Compare

Request quotation for: 2021 Professional HFPV-1B Pile Driving Machine foundation Construction Equipment Solar Pile Driver

Product Description

Solar Project Ground Screw Drilling Machine, Hydraulic Crawler Pile Drilling HFPV-1B

HFPV-1B solar drilling rig, using new type of hydraulic technology, convenient for hole transfer. The drilling machine structure is compact,.while the mast has adjustable compensation function, when drilling, the mast supported on the ground, borehole stability is good. The machine hydraulic pressure can be adjusted according to different soil textures, so as to achieve the appropriate impact power for pile driving, it is a new type of pile driver.
Application
The drilling rig is mainly used in pile driving for photovoltaic Solar power station , pile driving for Highway guardrail, highway guardrail construction engineering construction, etc.
Technical Data
Technical parameters
Impact frequency(bpm)
450–800
Impact(j)
1000
Work pressure(bar)
130—150
Once promotion(mm)
4100
Maximum ramming length(mm)
6000
Skid pitch(°)
95
Boom swing angle(°)
110
Boom pitch(°)
30°
Swinging angle of skid(°)
left and right total 40
Host power(kW)
88
Climb ability(°)
35
Dimension(L*W*H)(mm)
6240*2250*3000
Weight(Kg)
7350
Walk speed(km/h)
0–2.5
Note: The Company’s products continued to improve; various design and technical specifications may change at any time, without any
additional notice or obligation.
Construction Site
Company Introduction
FAQ
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.

2. How is the quality of your machine?
Our products pass strict quality inspections before they leave the factory to ensure that they are qualified before they are shipped.

3. How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.

4. Do you have after-sales service?
Yes, we have a dedicated service team that will provide you with professional technical guidance. If you need, we can send our engineers to your workplace and provide training for your employees.

5. How about quality assurance?
We provide a one-year quality guarantee for the main machine of the machine.

6. How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.

Model Number

HFPV-1B

Power

88kW

0★

Rating

  • 5★ 0
  • 4★ 0
  • 3★ 0
  • 2★ 0
  • 1★ 0

Reviews

There are no reviews yet.

Be the first to review “2021 Professional HFPV-1B Pile Driving Machine foundation Construction Equipment Solar Pile Driver”

Your email address will not be published. Required fields are marked *

Vendor Information

  • Address:
  • 5.00 5.00 rating from 1 review